3.2.8 Tariff Policy

Electricity transmission tariffs

Permenergo Index 5 years (2023-2027)
Sverdlovenergo RABregulatory asset base 5 years (2024-2028)
Chelyabenergo Index 5 years (2023-2027)

In 2025, the regulators applied the return on invested capital method (RABregulatory asset base) to Sverdlovenergo and method of long-term indexation of the gross revenue requirement (INDEX) to Permenergo and Chelyabenergo .

Uniform (“pie”) tariffs comprise expenses of all grid companies operating in the region to be annually prescribed for the next year during the long-term regulation period. Pursuant to existing tariff regulation laws, a gross revenue requirement is subject to annual fine-tuning, adjusted for changed real and target calculations, executed investment program and achieved reliability and quality of service indicators. Uniform (“pie”) electricity transmission tariffs to be enforced in 2025 were approved by the tariff decisions of the relevant regional regulators[18-20]. All branches of PAOPublic Joint-Stock Company Rosseti Ural have been designated as the SIRGOs in the Perm, Sverdlovsk and Chelyabinsk regions for the period 2025–2029.

YoY changes of the GRRgross revenue requirement are presented in the diagram below.

Note: Information hereof complies with the 2023-2025 tariff model, used by the regulators in setting of the 2023-2025 tariffs for electricity transmission.

Key factors that changed the “pie” gross revenue requirement in 2025

Branch MU 2023 2024 2025 2025/2024, % Comments
Permenergo
Electricity transmission GRRgross revenue requirement approved in the tariffs, incl: RUBruble million 27,225 29,497 32,579 110.45% Growth of unified (pie) tariffs
GRRgross revenue requirement for own needs RUBruble million 13,675 14,427 16,676 115.59%
PAOPublic Joint-Stock Company FSK-Rosseti services RUBruble million 3,835 4,096 4,807 117.36% Growth of UNESunited national energy system tariffs
Loss compensation RUBruble million 4,476 4,771 5,275 110.56% Growth of loss purchase price
Payments to RGOsRegional grid operators (in line with the contracts) RUBruble million 5,239 6,203 5,821 93.84% Reduction of the number of RGOsRegional grid operators due to the deprivation of their RGOregional grid operators status as a result of failure to comply with criteria
“Pie” net supply kWhkilowatt-hour million 15,344 15,344 15,703 102.34%
Average transmission tariff (breakdown by branches) RUBruble/kWh 1.774 1.922 2.075 107.93%
Standardized tariff rates to cover expenses related to connection of consumers’ equipment, grid facilities owned by gridcos and other entities, in line with clause 16a of the FASFederal Antimonopoly Service Guidelines RUBruble per 1 connection 5,256 4,876 6,296 129.12%
Sverdlovenergo
Electricity transmission GRRgross revenue requirement approved in the tariffs, incl: RUBruble million 48,050 49,312 58,421 118.47% Growth of unified (pie) tariffs
GRRgross revenue requirement for own needs RUBruble million 16,229 16,249 21,496 132.29%
PAOPublic Joint-Stock Company FSK-Rosseti services RUBruble million 9,282 10,545 12,332 116.95% Growth of UNESunited national energy system tariffs
Loss compensation RUBruble million 6,088 4,549 4,862 106.88% Growth of loss purchase price
Payments to RGOsRegional grid operators (in line with the contracts) RUBruble million 16,451 17,969 19,731 109.81% Growth of individual tariffs for RGOsRegional grid operators
“Pie” net supply kWhkilowatt-hour million 27,109 26,615 27,181 102.13%
Average transmission tariff (breakdown by branches) RUBruble/kWh 1.772 1.853 2.149 116.00%
Standardized tariff rates to cover expenses related to connection of consumers’ equipment, grid facilities owned by gridcos and other entities, in line with clause 16a of the FASFederal Antimonopoly Service Guidelines RUBruble per 1 connection 6,960 9,375 13,756 146.73%
Chelyabenergo
Electricity transmission GRRgross revenue requirement approved in the tariffs, incl: RUBruble million 27,204 28,624 32,745 114.40% Growth of unified (pie) tariffs
GRRgross revenue requirement for own needs RUBruble million 10,867 12,336 15,072 122.18%
PAOPublic Joint-Stock Company FSK-Rosseti services RUBruble million 4,420 5,108 6,457 126.41% Growth of UNESunited national energy system tariffs
Loss compensation RUBruble million 5,037 5,713 6,311 110.47% Growth of loss purchase price
Payments to RGOsRegional grid operators (in line with the contracts) RUBruble million 6,880 5,467 4,905 89.72% Reduction of the number of RGOsRegional grid operators due to the deprivation of their RGOregional grid operators status as a result of failure to comply with criteria
“Pie” net supply kWhkilowatt-hour million 15,618 15,610 15,616 100.04%
Average transmission tariff (breakdown by branches) RUBruble/kWh 1.742 1.834 2.097 114.35%
Standardized tariff rates to cover expenses related to connection of consumers’ equipment, grid facilities owned by gridcos and other entities, in line with clause 16a of the FASFederal Antimonopoly Service Guidelines RUBruble per 1 connection 7,046 7,553 8,776 116.19%

Analysis of revisions of the average electricity transmission tariff (adjusted for net supply on generator voltage level), RUBruble/ kWhkilowatt-hour*:

Branch 2023 2024 2025
Permenergo 1.774 1.922 2.075
Sverdlovenergo 1.772 1.853 2.149
Chelyabenergo 1.742 1.834 2.097
TOTAL 1.765 1.866 2.115
Growth, % 17.9% 5.8% 13.3%
Note: Information hereof complies with the 2023-2025 tariff model, used by the regulators in setting of the 2023-2025 tariffs for electricity transmission.

Technological connection fee

Pursuant to the Guidelines[21] the regulators of the Perm, Sverdlovsk and Chelyabinsk regions have set the 2025 standardized tariff rates, privileged connection rates per 1 kW capacity and connection fee formulas. The 2025 connection rates are approved by the regional regulators[22-25].

Rates for individuals with maximum 0-15 kW capacity inclusive (incl. previously connected capacity at the point) to be connected to 0-0.4 kV grid facilities, provided that the distance between the boundaries of an applicant’s land plot and nearest grid facilities of required voltage, owned by the gridco to which an applicant submitted its request, does not exceed 300 m in urban areas (cities and small towns) and 500 m in rural areas and microgeneration facilities:

Region Rate amount (incl. VATvalue-added tax)
Perm region RUBruble 8,000 per 1kW
Sverdlovsk region RUBruble 10,000 per 1 kW
Chelyabinsk region RUBruble 10,000 per 1 kW

The connection fee for underprivileged citizenry (low-income citizens, veterans, disabled people, etc.), provided that the distance between the boundaries of an applicant’s land plot and facilities of 0-0.4 kW voltage, owned by the gridco to which an applicant submitted its request, does not exceed 300 m in urban areas (cities and small towns) and 500 m in rural areas, was set at RUBruble 1,198.77 per 1 kW, incl. VATvalue-added tax.

Regulatory authorities also adopted decisions on setting the charge for connection to the electric networks of PAOPublic Joint-Stock Company Rosseti Ural under individual projects, the cost of which is likewise calculated in accordance with methodological guidelines, using the approved standard tariff schemes. A total of 21 resolutions on establishing charges under individual projects were adopted, for an aggregate amount of RUBruble 46.9 million excluding VATvalue-added tax (the largest applicant being OOOLimited Liability Company NTC “Privodnaya Tekhnika”, with RUBruble 21.2 million excluding VATvalue-added tax). In addition, planned expenses related to the performance of technological connection, which are not included in the charge for technological connection, were included in the gross revenue requirement of the transmission tariffs in the amount of RUBruble 2,152 million.